Picking the right roll-off dumpster size for your house project saves money, avoids overage fees, and keeps your renovation, roofing, or new-build work moving smoothly. Here’s a clear guide to comHouse Dumpster Sizes Decoded (10–40 yd): Renovation, Roofing & New-Build Use Casesmon dumpster sizes, what actually fits, and how to choose the best option for house renovations, re-roofs, and home construction projects. (Sizes and weights vary by hauler—always confirm local specs before booking.)
Quick size guide (typical interior dims & ton caps for house projects)
Size | Approx. interior dims* | Typical ton cap** | Best for |
---|---|---|---|
10 yd | 12–14′ L × 7–8′ W × 3–3.5′ H | ~1–2 tons | Small house bath remodel, flooring tear-out (1–2 rooms), light roofing, garage clean-out |
20 yd | 22′ L × 7–8′ W × 4–4.5′ H | ~2–3 tons | House kitchen remodels, multi-room updates, mid-size roofing projects, deck removal |
30 yd | 22′ L × 7–8′ W × 6′ H | ~3–4 tons | Whole-house clean-outs, larger home additions, light new-build debris |
40 yd | 22′ L × 7–8′ W × 8′ H | ~4–6 tons | Major home renovations, commercial tenant improvements, framing/rough-in debris on house new builds |
Exterior dimensions may be slightly larger
** Ton caps are common allowances; overages billed per ton
Renovation scenarios for house projects: which size fits?
House bathroom refresh (tub/shower, vanity, tile): 10 yd
Cast-iron tubs and tile add weight quickly—check ton cap if you’re demoing masonry or thick mud beds.House kitchen remodel (cabinets, counters, flooring, some drywall): 20 yd
Removing heavy stone counters or multiple layers of tile? Consider a 30 yd or ask for extra tonnage.Whole-house clean-out or multi-room update: 30 yd
Bulky items like sofas, built-ins, and doors use up volume before weight. One 30 yd is often cheaper than two 10 yds.Heavy materials (concrete, dirt, brick, roofing tile) for house jobs:
Use a clean-load bin priced per ton, keep it free of trash. Heavy debris works best in smaller cans (10–12 yd) to avoid over-weight charges.
If you are located near Cedar City and need a dumpster fast for your house remodel or clean-out, book local rentals with A To Z Construction, who provide right-sized containers and clear tonnage rules.
Roofing: squares, layers, and house project weight
Shingle weight varies (~200–450 lbs per roofing square) by type, age, and layers.
Up to ~20–25 squares (single layer): 10 yd dumpster is common.
~25–40 squares (single layer): 20 yd dumpster.
Multiple layers or heavy architectural shingles: bump up one size or add tonnage.
Pro tip for house roofing: Load evenly front-to-back, don’t stack above fill line, and if possible keep underlayment/wood separate for clean-load pricing.
New-build house debris: staging the right way
Framing cutoffs, wrap, drywall, and packaging look light but fill space fast.
Foundation to framing phase: 20 yd (light but bulky).
Drywall/trim phase: 30 yd to avoid overflow.
Exterior and final clean: 10–20 yd for siding scraps, flooring boxes, and cardboard.
Coordinate dumpster swaps with your house build schedule to prevent idle crews and site mess. For ground-up or major house additions in Southern Utah, align your waste management plan with your builder’s milestones. Prestigious Home Builders can advise on bin placement, swaps, HOA, and permit rules during your new house construction in Utah.
Placement, permits, and house site protection
Protect your driveway with 4×8 plywood sheets under dumpster rails to reduce scuffs.
Street placement often requires city permits and safety cones—confirm with your hauler.
Keep dumpsters away from house eaves, power lines, and trees for safe pickup.
Ensure truck access with level ground; steep driveways or gates can block delivery.
What NOT to toss from your house project
Liquids, paints, solvents, tires, batteries, appliances with refrigerants
Hazardous waste: oils, pesticides, asbestos, medical waste
Large tree stumps or saturated soil without prior approval
Mixing banned items can cause contamination or trigger trip fees—always ask your hauler for the “do not load” list.
Cost controls for house dumpsters: avoid surprise fees
Pick the right size first — one properly sized dumpster is cheaper than multiple hauls.
Watch ton caps: heavy debris? Request a higher cap or a clean-load bin.
Standard house dumpster rentals are ~7 days; longer holds may incur daily fees.
Load level with no overfills to avoid refusal or costly reloads.
Quick decision tree for house projects
Small bathroom or flooring room refresh → 10 yd
House kitchen or mid-size interior remodel → 20 yd
Whole-house clean-out or larger home addition → 30 yd
Major house renovation, commercial TI, or long new-build → 40 yd (or staged 20→30 yd)
Heavy materials (concrete/dirt/tile) → Dedicated heavy debris bin (10–12 yd)
Final takeaway for your house dumpster needs: Match the container to the actual debris type, keep heavy materials separate, and stage dumpster swaps to your build milestones. That’s how you stay on schedule and budget—whether renovating a house bathroom, roofing your home, or building your dream house from the ground up.